PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pouring concrete slab on deck (2nd Floor) Facing West (800x600).jpg Slab on deck (2nd Floor) Facing North-West (800x600).jpg Started installing conduit at the 1st Floor Facing West (1) (800x600).jpg Started installing conduit at the 1st Floor Facing West (2) (800x600).jpg
Previous pageNext page Started installing conduit at the 1st Floor Facing West (1) (800x600)
Started installing conduit at the 1st Floor Facing West (1) (800x600)